Reports until 16:00, Monday 09 June 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Monday 09 June 2014 (12269)
OPs Shift Summary
8:00 Work on Genie and Forklift behind the Highbay – Mid Columbia Forklift
9:13- 11:38 Heading to HAM6 to continue on ISI work – Hugh
9:22- AA-AI Chassis modifications for ISC in Electronics room – Filiberto/Aaron
9:28- Going to EndX to grab some parts to work on HAM6 – Corey
10:00-12:11 Baffle work in LVEA (West bay) – Gerardo/Scott
10:30-Heading into HAM6 to do some testing – Corey/Keita
13:00- Back into LVEA   (West bay)  for more Baffle work– Gerardo/Scott
13:13- Installing SUS Watchdog chassis and running cable at EndY – Filiberto/Aaron
13:51- Dump unpumped volume seen by PT246 into RGA turbo*isolated turbo from RGA*open 10" BT valve thus exposing RGA and PT246 to BT* Begin scanning at MidY/EndY – Kyle
13:55- 14:45 Heading back to HAM6 to continue on ISI work – Hugh
14:07- De-install receiver pylon for PCAL welding at EndX VEA – Thomas
14:15- Heading into the LVEA to relocate dust monitor – Jeff B.
14:35-Going into the H2 PSL enclosure – Peter
14:54 SPRAGUE on site.
15:00 EX VEA transitioned to laser SAFE