Reports until 16:00, Tuesday 10 June 2014
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Tuesday 10 June 2014 (12284)
Ops summary
Ken working on rewiring lighting in the control room

08:49 Cyrus rebooting network switch
08:54 Jason to work with Thomas on removal of ITMX optical lever components
09:07 Hugh to HAM6 to unlock and balance the ISI
09:18 Jeff K. restarting BS model for code change (WP 4666)
09:26 Cyrus rebooting network switch for phones
09:34 Betsy, Travis, Gary and Jeff K. installing ITMX
09:57 Jeff B. recabling dust monitors 1 and 6, moving dust monitor 1 to GV7 spool
09:57 Jason and Thomas done removing optical lever components
10:00 Gerardo and Scott assembling cyropump baffle
~10:32 Paradise water delivery
10:33 Bubba to end Y to get flange cover and bang board
10:35 Patrick added 250 mL H2O to H1 PSL diode room crystal chiller
10:39 Patrick reset the L4C counters for HAM4, ITMX and ETMY
10:40 Jeff B. done recabling and moving dust monitors
10:42 Cyrus rebooting front end network switch
10:45 Jeff and Andres working on contamination control kits for HAM4, 5
11:07 Cyrus rebooting the DAQ switch
11:13 Cyrus done work on network switches
11:22 Dave stopping models at end Y for work on IOP watchdogs (WP 4665)
11:28 Patrick restarted the weather station IOCs
11:35 Cyrus to end stations
11:45 Thomas leading tour through control room
11:49 Jeff and Andres done working on contamination control kits
12:14 Jim B. to end Y to swap cables for hardware watchdog
12:17 Cyrus back from end stations
12:37 Jim B. back from end Y
12:39 DAQ restart for Jeff K.'s model change

Corey to HAM6
Mid Columbia Forklift arrived to fix genie lift

15:48 Gerardo and Scott done working on cyropump baffle