Ken working on rewiring lighting in the control room 08:49 Cyrus rebooting network switch 08:54 Jason to work with Thomas on removal of ITMX optical lever components 09:07 Hugh to HAM6 to unlock and balance the ISI 09:18 Jeff K. restarting BS model for code change (WP 4666) 09:26 Cyrus rebooting network switch for phones 09:34 Betsy, Travis, Gary and Jeff K. installing ITMX 09:57 Jeff B. recabling dust monitors 1 and 6, moving dust monitor 1 to GV7 spool 09:57 Jason and Thomas done removing optical lever components 10:00 Gerardo and Scott assembling cyropump baffle ~10:32 Paradise water delivery 10:33 Bubba to end Y to get flange cover and bang board 10:35 Patrick added 250 mL H2O to H1 PSL diode room crystal chiller 10:39 Patrick reset the L4C counters for HAM4, ITMX and ETMY 10:40 Jeff B. done recabling and moving dust monitors 10:42 Cyrus rebooting front end network switch 10:45 Jeff and Andres working on contamination control kits for HAM4, 5 11:07 Cyrus rebooting the DAQ switch 11:13 Cyrus done work on network switches 11:22 Dave stopping models at end Y for work on IOP watchdogs (WP 4665) 11:28 Patrick restarted the weather station IOCs 11:35 Cyrus to end stations 11:45 Thomas leading tour through control room 11:49 Jeff and Andres done working on contamination control kits 12:14 Jim B. to end Y to swap cables for hardware watchdog 12:17 Cyrus back from end stations 12:37 Jim B. back from end Y 12:39 DAQ restart for Jeff K.'s model change Corey to HAM6 Mid Columbia Forklift arrived to fix genie lift 15:48 Gerardo and Scott done working on cyropump baffle