Displaying report 1-1 of 1.
Reports until 18:00, Tuesday 10 June 2014
H1 CDS (SUS)
james.batch@LIGO.ORG - posted 18:00, Tuesday 10 June 2014 (12304)
Suspension Hardware Watchdog at EY status
Dave, Jim

A hardware watchdog chassis has been installed in the suspension electronics rack under the Binary Input and Output chassis at EY.  It is currently connected to monitor ports on the satellite amps for M0.  It is NOT connected to interrupt the drive from the coil drivers.  This is only for testing the watchdog.  The RMS output from the watchdog is connected to the h1pemey AA chassis channel 31, while 3 of the outputs to turn off the coil drivers are connected to h1pemey AA chassis channel 28-30 for monitoring.

The watchdog is powered up, and we can monitor the status, but we have not succeeded in sending commands to set parameters for testing.
Displaying report 1-1 of 1.