ITMY install planned for today
BSC1: two central pieces of BSC flooring will be removed to ease cleaning of two "hotspots" identified in prior vent cycle. Spots will be cleaned with isopropanol and Alpha 10 wipes. Flooring will be returned and ITMY install will proceed.
Bubba - Spool piece is out
Bubba - moving 3IFO ISI's via crane in LVEA
Peter K et al working in both H1 and H2 PSL enclosures
Aaron working on AA/AI chassis at EY, will require shutting down some systems