With the addition of the planned Table Top payload per D1201388-v3, I pulled 119kg from the ISI sidewalls. Based on previous ocurrances like this, I don't believe th eCOG sci/eng will be bothered by this CG vertical shift. Will run TFs asap once ICS is done with their cable work.