Reports until 16:12, Friday 20 June 2014
H1 SEI (INS)
hugh.radkins@LIGO.ORG - posted 16:12, Friday 20 June 2014 (12442)
WBSC3 HEPI DI'd Locked and Horizontal Actuators Disconnected

Apollo got the cleanroon pulled back enough to allow us access for the Dial Indicators on the West side.  Once we found a few appropriate ladders and got them wedged into place, we locked the platform and disconnected the Horiozontal Actuators from the Feet.

On Monday we'll get the load cells readers on and continue with the vertical actuator disconnect.

We might be ready to reposition (and IAS checks/direction) Monday afternoon.