I've finished terminating and testing the Cat6A runs at EX and EY for the cameras and the field rack. The vacuum rack side of the runs is also terminated, but I am waiting for the appropriate shielded/grounded patch panel to finalize what's installed. In the meantime, exercise some caution around these cables if working in the vacuum rack.