gerardo.moreno@LIGO.ORG - posted 16:17, Wednesday 25 June 2014 (12484)
Ops Summary

9:00 am Jim W to CS VEA, work on HAM4 ISI, and removal of septum blank.
9:15 am Corey, Matt and Volker to CS VEA, HAM2 ISS PD array related work.
9:30 am Apollo to CS VEA, aide with removal of septum blank, removal of North door at HAM4 and removal of temporary septum at HAM4|BSC2.
10:00 am Filiberto and Aaron to CS VEA, HAM5/6 area cable pulling work.
10:30 am Jeff B to CS VEA, contamination control related work by HAM4 area, dust monitor.
11:00 am Added 300 ml of water to H1-PSL chiller.
12:47 pm Travis to CS VEA, work on ITMX alignment.
12:54 pm Betsy, Calum and Kate to CS VEA, join Travis for ITMX alignment work and "green" light related work.
12:55 pm Jeff B to CS VEA, contamination control related work by or in the beer garden.
1:18 pm Thomas to CS VEA, inventory of parts.
1:56 pm Volker, Corey and Matt go back to CS VEA, HAM2 work.
3:09 pm Jeff B to CS VEA, contamination control investigation around HAM5/6, during cable pulling event.
3:10 pm Rick S to CS VEA, setting H1 laser enclosure to science mode.  NOTE: Rick reports an odd smell inside the H1 PSL laser enclosure.