- SUS needs to do pitch work on ITMX
- Higher dust counts recorded on ITMX (~1000's) than HAM chambers (~10's), this is due to too many volumes open at the same time in the LVEA.
- ISS work on going in HAM2, beam was blocked at MC1 and MC3 for redundant protection.
- Sheila and Kiwamu are preparing for beam splitter install at HAM3
- Jason is going to do a shot and prepare for HWS alignment from the ITMX spool
- Calum and Kate are going to walk about the End stations
- Corey is going to take pictures of the LVEA from the manlift