Yesterday, with Mark's help I took videos of a walk round at EndX and EndY at LHO. The purpose was to record where various pumps, instruments etc are located to aid Systems in updating drawings. In particular we noted the positions of the trillium seismometers, taking measurements from fixed references. Videos, stills etc are saved on the DCC at T1400438.