Reports until 13:34, Monday 30 June 2014
H1 SUS
betsy.weaver@LIGO.ORG - posted 13:34, Monday 30 June 2014 - last comment - 15:15, Monday 30 June 2014(12541)
Particle counts in BSC3 this morning

Here are the particle counts from in side of BSC3 (in the same usual spot near the floor where we have been measuring for the last ~week).

 

After ~20mins of 1 guy in chamber:

0.3um  100

0.5um  40

1.0um  10

 

2 people in chamber, but counts taken just after 1 had walked around down in bottom floor of chamber and crawled up under the ACB:

0.3um  1160

0.5um  780

1.0um  340

 

~45 mins later while doing more baffle work, less walking on chamber floor:

0.3um  398

0.5um  284

1.0um  99

Comments related to this report
calum.torrie@LIGO.ORG - 15:15, Monday 30 June 2014 (12545)

As per note in https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=12488 at next opportunity i.e. when optic can be protected by lens cap the floor (of the chamber) and the flooring should be wiped and vacuumed. Jeff Bartlett has this on his to do list.