08:34 Karen at end Y 08:48 Peter to H1 PSL enclosure to check problem with laser 08:48 Jeff B. to HAM 2,3,4 to work on contamination control 08:49 Filiberto to end Y to work on TCS cabling 09:11 Cyrus restarting the EPICS gateway for the vacuum subnet 09:16 Jeff B. out of the LVEA 09:21 alarm for end Y rollup door open 09:31 Karen leaving end Y 09:43 Cyrus done with EPICS gateway restarts 10:06 Dave restarting the IOP and user models for SUS and SEI BSC 1,2,3 to complete software WD updates 10:32 Dave done with model restarts 10:32 Justin transitioned the LVEA to laser safe 10:35 Call from Praxair driver to inform delivery is ~15 min away 10:51 Dave, Jim B. to end X to install HWS computer 11:08 Rick to join Matt and Peter in the H1 PSL enclosure to help address a water leak on the laser table 11:55 Jeff B. and Andres out of the LVEA 11:55 Dave and Jim B. back to end X 12:12 Jim B. back from end X 13:05 Matt to HAM2 to start ISS alignment work 13:57 Jeff B. and Andres to HAM 4,5 to work on contamination control 14:09 Cyrus to end X to install a patch panel and check the HWS computer 15:19 Cyrus done at end X, going to install patch panel at end Y 15:19 Justin transitioning the LVEA South and East bay to laser hazard 15:33 Jeff B. and Andres done in LVEA 15:39 Arnaud starting measurements on SUS ITMX