Reports until 16:57, Tuesday 01 July 2014
LHO General
patrick.thomas@LIGO.ORG - posted 16:57, Tuesday 01 July 2014 (12559)
Ops Summary
08:34 Karen at end Y
08:48 Peter to H1 PSL enclosure to check problem with laser
08:48 Jeff B. to HAM 2,3,4 to work on contamination control
08:49 Filiberto to end Y to work on TCS cabling
09:11 Cyrus restarting the EPICS gateway for the vacuum subnet
09:16 Jeff B. out of the LVEA
09:21 alarm for end Y rollup door open
09:31 Karen leaving end Y
09:43 Cyrus done with EPICS gateway restarts
10:06 Dave restarting the IOP and user models for SUS and SEI BSC 1,2,3 to complete software WD updates
10:32 Dave done with model restarts
10:32 Justin transitioned the LVEA to laser safe
10:35 Call from Praxair driver to inform delivery is ~15 min away
10:51 Dave, Jim B. to end X to install HWS computer
11:08 Rick to join Matt and Peter in the H1 PSL enclosure to help address a water leak on the laser table
11:55 Jeff B. and Andres out of the LVEA
11:55 Dave and Jim B. back to end X
12:12 Jim B. back from end X
13:05 Matt to HAM2 to start ISS alignment work
13:57 Jeff B. and Andres to HAM 4,5 to work on contamination control
14:09 Cyrus to end X to install a patch panel and check the HWS computer
15:19 Cyrus done at end X, going to install patch panel at end Y
15:19 Justin transitioning the LVEA South and East bay to laser hazard
15:33 Jeff B. and Andres done in LVEA
15:39 Arnaud starting measurements on SUS ITMX