Displaying report 1-1 of 1.
Reports until 16:02, Tuesday 01 July 2014
H1 CDS
cyrus.reed@LIGO.ORG - posted 16:02, Tuesday 01 July 2014 (12577)
EX/EY Network Wiring
I received the patch panels required to finish the wiring at EX and EY, so I installed them this afternoon.  I had to briefly disconnect the vacuum rack switch at EX to re-route a fiber that was in the way.  This closes out WP 4684.
Displaying report 1-1 of 1.