Displaying report 1-1 of 1.
Reports until 16:11, Tuesday 08 July 2014
H1 SUS
betsy.weaver@LIGO.ORG - posted 16:11, Tuesday 08 July 2014 (12654)
MC2 moved 2mm closer to MC1/MC3

This afternoon, we used a 2mm guage block and HXTS pushers to slide the MC2 structure towards MC1/3 (to make a shorter MC) as per ISC instruction.  We reclamped all of the dog clamps in hope that we did not introduce much yaw error while pushing it.  We'll wait until the MC beam bypass is removed to flash the MC and confirm.

Displaying report 1-1 of 1.