This afternoon, we used a 2mm guage block and HXTS pushers to slide the MC2 structure towards MC1/3 (to make a shorter MC) as per ISC instruction. We reclamped all of the dog clamps in hope that we did not introduce much yaw error while pushing it. We'll wait until the MC beam bypass is removed to flash the MC and confirm.