X1 SEI
corey.gray@LIGO.ORG - posted 08:15, Tuesday 23 August 2011 (1266)
BSC Assembly Status

This entry covers work from last Fri-today.

(Corey, Eric, Greg, Jim)

BSCISI#1

Capacitive Position Sensors (CPS) were replaced on this assembly.  There was bad solder/flux on these CPS.  The new CPS were installed and need to be aligned and have their gaps set; will do this and re-balance the system when the SUS team is done with their work.

BSCISI#3

Stage1 Close Out Plate & Cover were installed & torqued down.  Inner Hex and Outer Walls have been installed for upcoming Keel Installation.  The Top-Facing Keel is getting helicoiled. 