This entry covers work from last Fri-today.
(Corey, Eric, Greg, Jim)
BSCISI#1
Capacitive Position Sensors (CPS) were replaced on this assembly. There was bad solder/flux on these CPS. The new CPS were installed and need to be aligned and have their gaps set; will do this and re-balance the system when the SUS team is done with their work.
BSCISI#3
Stage1 Close Out Plate & Cover were installed & torqued down. Inner Hex and Outer Walls have been installed for upcoming Keel Installation. The Top-Facing Keel is getting helicoiled.