Reports until 10:02, Friday 11 July 2014
H1 SUS
betsy.weaver@LIGO.ORG - posted 10:02, Friday 11 July 2014 (12674)
ITMy SUS install status

On Wed, Travis and I were able to coarsely align the ITMy main chain pitch.  This involved the loathed addable mass swapping at the UIM in order to correct a differential pitch between Top Mass and UIM.  We are at the point that we need a first look from IAS to determine how to progress.  

With Fil's help, we also checked out the ESD connections.  This turned into a mess whereby we chased non-functioning throughput up through the connections within the SUS and ISI back to the feedthru.  The connection at the inside of the feedthru seemed fussy and needed reseating multiple times in order to get all 5 pins to connect properly with signal to the outside world.  From there, continuity was checked at the CP connection which failed on 2 pins.  So, more investigating of the cable running from the ISI table to the CP needs to be done (and possibly a full cable swap).