Andres R. & Jeff B. We reglued the second magnet broken off the Intermediate Mass (the Lower Left). There were no problems encountered during the repair. We will remove the jig after 24 hours. If the bond is good, we will remount and align the BOSEMs and put the baffle (mover for access to the magnets) back into its position for ISI balance work. Both broken magnets were removed from the chamber. Particle Counts Before Work: Cleanroom Cover on: 0.3 = 0, 0.5 = 0, 1.0 = 0 In Chamber Cover on: 0.3 = 0, 0.5 = 0, 1.0 = 0 During work In chamber: 0.3 = 17, 0.5 = 10, 1.0 = 0 After Work: Cleanroom Cover on: 0.3 = 0, 0.5 = 0, 1.0 = 0 In Chamber Cover on: 03. =0, 0.5 = 0, 1.0 = 0