Reports until 16:00, Friday 11 July 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Friday 11 July 2014 (12720)
OPs Shift Summary
9:06- 10:24 Heading into the LVEA to fix rubbing on SR3 – Jeff B.
9:10- 10:00 Moving Laser barriers around in the LVEA – Justin
9:16-12:00 Heading to the LVEA to align PR2 – Kiwamu/Jeff K
9:20- Heading to work in the optics lab – Nathan
9:37- 10:30 Checking the PSL power (LVEA) – Kiwamu
10:01- 12:00 Going to EndY to work on H1 ISC table – Sheila/Daniel
9:40-- Working on Turbo/QDP80 pumps at End X – Gerardo/Kyle
10:38- 12:00 Back to the LVEA to work on Contamination & Controls – Jeff B
10:46-10:57 Heading into the LVEA by ITMY to check on Seismometers – Hugh
10:48- Searching for cables in the LVEA - Corey 
11:52- 12:12 Covering Viewports in LVEA – Gerardo
12:00 – Motorized Rotation Staged have been de-energized and key put away – Jeff K
12:45 - Transitioning the LVEA south and east bay to laser HAZARD – Justin
13:00 -15:00 Working on HAM5 – Betsy/Travis
13:12- 15:27 Heading to the LVEA to continue on the ITMY alignment setup – Jason/Dugh
14:01- 15:16 Going back to the LVEA to work on Contamination and Control – Jeff B.
15: 18 Transitioning LVEA to Laser Safe- Justin