9:06- 10:24 Heading into the LVEA to fix rubbing on SR3 – Jeff B. 9:10- 10:00 Moving Laser barriers around in the LVEA – Justin 9:16-12:00 Heading to the LVEA to align PR2 – Kiwamu/Jeff K 9:20- Heading to work in the optics lab – Nathan 9:37- 10:30 Checking the PSL power (LVEA) – Kiwamu 10:01- 12:00 Going to EndY to work on H1 ISC table – Sheila/Daniel 9:40-- Working on Turbo/QDP80 pumps at End X – Gerardo/Kyle 10:38- 12:00 Back to the LVEA to work on Contamination & Controls – Jeff B 10:46-10:57 Heading into the LVEA by ITMY to check on Seismometers – Hugh 10:48- Searching for cables in the LVEA - Corey 11:52- 12:12 Covering Viewports in LVEA – Gerardo 12:00 – Motorized Rotation Staged have been de-energized and key put away – Jeff K 12:45 - Transitioning the LVEA south and east bay to laser HAZARD – Justin 13:00 -15:00 Working on HAM5 – Betsy/Travis 13:12- 15:27 Heading to the LVEA to continue on the ITMY alignment setup – Jason/Dugh 14:01- 15:16 Going back to the LVEA to work on Contamination and Control – Jeff B. 15: 18 Transitioning LVEA to Laser Safe- Justin