What I was able to hear from meeting:
-
SRM alignment check this morning? (pull first contact (Betsy), laser hazard (Justin), & check)
-
Lower SR3 OSEM adjustments this afternoon when Laser SAFE (Jeff/Andres)
-
Status: SEI HAM4 & 5 balanced, & locked
-
SR2 (calum/kate) start cleaning while locked?
-
ITMy--coarse alignment, address 2mm misalignment?
-
BSC3--trying to close, wait for clean by Calum/Kate cleaning
-
BS--parts (wire protection baffle) in C&B/avail Fri for installation?
-
EX Status: vent slated today (door off tomorrow), no first contacting required of ETMx,need ISI locked, need laser hazard (but can transition when needed).
-
EX: TMS first part of week, may want to correct TMS pitch (which has been corrected by using HEPI up to now)
-
EX: PCAL starting midweek. need new SOP for their laser
-
EY--bakeout of deionizer (out Fri), drill holes for it?
-
EY--pulling cables for beam centering wfs
-
EX pulling cable for dust moniters (require code change)
-
RCG upgrade for Channel Monitoring (Jamie), parisitic checks, possibly use/test with ETMy
-
Viewport surveys: HAM4,5, BSC3
-
Detchar Meeting Mon-Wed this week
-
Film crew here this morn
-
Jordan & Paul new students from UofO arrived