Reports until 09:03, Monday 14 July 2014
H1 PSL (PSL)
peter.king@LIGO.ORG - posted 09:03, Monday 14 July 2014 (12728)
frontend watchdog restarted
The power watchdog for the frontend laser was (re)started this morning.

On a side note, the water level in the crystal chiller was about half way between maximum and minimum.  I added 200 millilitres to bring the level up to maximum.