Reports until 08:03, Tuesday 23 August 2011
H2 INS
hugh.radkins@LIGO.ORG - posted 08:03, Tuesday 23 August 2011 (1273)
EndY BSC6 Dome Removed & SuppTubes Freed
GregG JimW Slim Kevin Ed & Hugh
Re-Work Permit #2875/E1100715

On Monday afternoon we pulled the East cover from BSC6 (Inner O-ring is missing) so Jim could go in and disconnect the Wire Straps holding the Support Tubes in place.  Then using the Jib Cranes mounted on the Crossbeams, we lifted the Support Tubes so the Chocks could be removed from the D-Nozzles.

The dome was pulled and crammed into place on the North side of the BeamTube.

Today we planned to install the iLIGO Support Table to the Support Tubes and then connect the Support Tubes to the Crossbeams via the V-Blocks.