Reports until 12:21, Tuesday 15 July 2014
H1 SUS
betsy.weaver@LIGO.ORG - posted 12:21, Tuesday 15 July 2014 (12758)
SR alignment, continued

In an attempt to resume alignment of the output HAM optics, this time with the aligned ITMy, we unshuttered the PSL beam and entered HAM5 to look for it.  We found nothing.  Tracing steps backwards, we seem to find that the bypass optics near MC3 got brushed yesterday during the ground look hunt.  The PSL beam hits the monument on the wall a bit off in yaw.  So, we'll need to reflash the MC and tweek up the alignment of the bypass.  Kiwamu has already adjusted the power leaving the PSL down to 200mW.  After lunch, we'll start again.