Displaying report 1-1 of 1.
Reports until 12:05, Friday 18 July 2014
H1 SUS (SEI, SUS)
matthew.heintze@LIGO.ORG - posted 12:05, Friday 18 July 2014 (12842)
HAM3 suspensions locked. ISI now ready for balancing

Both HAM3 suspensions are locked. The wafer for mobility experiment placed back into position. Vertical wafer holder (no wafer) placed into position. 1" optic placed on the side of the MC2 cage. Optic still has FC on it. ISI now ready for balancing

Displaying report 1-1 of 1.