HAM2 - Checking for grounding loops
The following cables at HAM2 were checked:

ISC_243 PSL SM2 QPD. Feedthru D4-3C2
ISC_244 Picomotors. Feedthru D6-F10

ISC_243 was checked at IOT2L cable end. Cable is currently disconnected since table is temporarily moved.
ISC_244 was checked at IS_R4 rack. The QPD Amp chassis was powered down before disconnecting cable at rack side. 

All cables checked out. All cables were reconnected and electronics powered on.

Filiberto Clara