The following cables at HAM2 were checked: ISC_243 PSL SM2 QPD. Feedthru D4-3C2 ISC_244 Picomotors. Feedthru D6-F10 ISC_243 was checked at IOT2L cable end. Cable is currently disconnected since table is temporarily moved. ISC_244 was checked at IS_R4 rack. The QPD Amp chassis was powered down before disconnecting cable at rack side. All cables checked out. All cables were reconnected and electronics powered on. Filiberto Clara