H1 AOS
patrick.thomas@LIGO.ORG - posted 17:32, Monday 21 July 2014 (12888)
Ops Notes
08:55 Daniel and Sheila working on optics table at end Y ?
09:00 Jodi reports H1 PSL chiller is alarming
09:02 Hugh to HAM 3,4,5 to balance check seismic
09:05 Jeff B. and Andres going to HAM 4 and 5 for contamination control closeout work
09:09 Paul and Jordan to end Y to work on PEM
09:10 Jeremy B. and Matt H. going to HAM 4 and 5 for closeout work
09:12 Jeff B. added 200 mL of water to the H1 PSL chiller
09:12 Nathan starting unattended work in optics lab with laser on
09:16 Mike V. to end X, PCAL work?
09:23 Rick called from end X, looking for Mike V.
09:30 Doug C. to ITMY, spool area to calibrate survey equipment
09:37 Jason heading out for ITMY alignment
09:46 Aaron to end Y to install illuminator chassis in SUS rack
09:52 end X is in laser hazard
09:53 Travis to ITMY to work on reaction chain alignment
11:15 Stewart and Arnaud to HAM 4 and 5 to better communicate with closeout team on transfer functions
12:48 end X is laser safe
12:59 Aaron to end Y with power cord for illuminator chassis, and then to end X to install illuminator chassis there
~13:30 Dale leading tour in control room
14:00 start of putting doors on HAM 4
14:11 Jeff K. to end X to measure cable tray lengths
14:12 Stewart into LVEA to start work on SR2
14:46 Hugh to electronics room to check coil driver chassis
14:56 Mike L. going to HAM 4 to talk to closeout team
15:05 Jeff K. back from end X
16:01 Nathan done unattended work in optics lab
16:30 Fred taking 2 visitors on tour through the LVEA
16:30 standing down on putting door back on HAM 4, reapplying first contact