Betsy, Travis
As Jeff mentioned in his log below, this afternoon we payloaded the ITMy SUS with:
- Sleeve
- Wedges
- Cross braces
- Vibration absorbers
- All trays, shields, and TFE support pieces removed
- We have 3 3/4" screws and 1 wafer holder to add, but these will be quick.
This involved the usual removal of 3 flooring panels to get the sleeve on, and their subsequent replacement.
Counts in the chamber before starting the work just after lunch were:
0.3um 60
0.5um 40
1.0um 20
An hour later during the high-traffic period of all of the above by just Travis and I, the counts were:
0.3um 1000
0.5um 550
1.0um 320
And then 20 mins later:
0.3um 540
0.5um 320
1.0um 120
Note, during the elevated counts Jeff had HAM3 soft covers open and was crawling around that table cleaning. More likely the higher counts were us with the heavy lifting and numerous screw attachments.