8:15-8:45 Morning Meeting 8:50-11:30 Heading into the LVEA to continue with HAM2/3 work – Matt/Jeremy 8:55-11:30 Contamination & Control work in LVEA - Jeff B 8:59-12:00 Going to End Y to work on illuminator – Aaron 9:15-12:00 Working on Optics Lab/Laser ON – Nathan 9:35-11:24 Locking/ Unlocking suspension in LVEA (BSC1 & BSC3) – Travis 9:39-11:24 Heading into the LVEA to work on ACB – Mitchell/Mike V. 9:52-12:18 Stage Viewport Preparation in LVEA – Gerardo 10:20-12:18 Joining Gerardo in the LVEA for Electric Field measurements – M. Laundry 10:22-11:30 HAM 2 testing in LVEA – Stuart/Arnaud 10:24 - Restarting h1odex model - Dave 12:13- 14:50 Heading back to the LVEA – Matt/Jeff B/Jeremy/Apollo 12:17- 14:50 Heading back to the LVEA – Stuart/Arnaud 12:43- Going to End X to work on illuminator – Aaron 13:12-13:56 Working at End Y – Karen 13:18- Replacing BSC2 ISI chassis in Electronics room – Filiberto 13:40-LVEA transitioning to Laser Hazard – Richard 14:21-12:18 Back to the LVEA for Electric Field measurements – Gerardo/M. Laundry 14:23- LVEA transitioning back to Laser SAFE – Richard 14:37- 15:40 Returning to the LVEA to work on ACB – Mitchell/Mike V.