After HAM2 doors went on, IMs tfs were ran last night (IM1 IM2 IM3 and IM4). The ISI was damped during the measurement. They are showing good agreement with the model, similarly as before HAM2 closeout. The results are attached below showing a comparison between all the IMs and the model.
Data and scripts were commited to the svn, particularly plothaux_matlabtfs.m (under sus/trunk/HAUX/Common/MatlabTools) with the corrected calibration (thanks to Jeff)