Betsy, Travis, Andres This afternoon, we started the chamber closeout steps. We: Locked the ITMX TM and CP masses in prep for FC removal. Started to clean the barrels of the optics. Started locking down all loose nuts on the SUS. Set the BOSEMs to account for the buoyancy effect under vacuum. Assisted with TCSx in chamber mirror alignment. Prepped the N2 gun and bottle for in chamber use. Took lots of particle counts. Wiped down as mush of the VS and ITMx as possible. Wiped the floors of BSC2 and 3 numerous times. Counts were high during and just after the wiping. They did not return to zero by the time we left the chamber at 4ish. Counts data to follow. Will wipe once more before pulling the FC tomorrow morning and putting the door on.
Comments related to this report
betsy.weaver@LIGO.ORG - 11:22, Friday 01 August 2014 (13144)

Particle counts during this flurry of BSC1-3 work on Wed were as follows.

Prior to anyone entering:

All zero

 

Spool C3 open and C3 observed to be pushing in to BSC chambers and again ~20 mins later:

0.3um  200,  180

0.5um  40,  80

1.0um  20,  30

 

Same C3 condition, but measured just after walking to BSC2 and measuring there:

0.3um  140

0.5um  60

1.0um  20

 

After wiping the BSC2 floor, same C3 open at spool, closed on BSC doors:

0.3um  1490

0.5um  570

1.0um  300

 

After more cleaning and work in BSCs, same C3 open at spool, closed on BSC doors, at BSC3 repeated 2x (at 90 and 120 mins of work):

0.3um  390,  520

0.5um  140,  270

1.0um  40,  140

 

All C3 closed at spool and BSC doors, after ~2 hours of work in BSCs, in BSC2:

0.3um  600

0.5um  350