Reports until 22:17, Wednesday 30 July 2014
H1 AOS (AOS)
gerardo.moreno@LIGO.ORG - posted 22:17, Wednesday 30 July 2014 (13100)
Output Septum Update

(Ed, Gerardo)

Two of the 3 ports are done, we installed blanks on VP1 and VP2, both were installed per procedure.

No glass was installed on VP3, because while we were busy prepping the blanks for the septum, someone took our staged top gun.
After installing the blanks, the glass viewport was prepped and is now ready for installation, I had to cobble together another top gun to remove the FC from the viewport.