Reports until 15:41, Friday 01 August 2014
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:41, Friday 01 August 2014 (13160)
Particlle Counts Y-Arm Spool Installation

Particle counts taken during the installation of the Y-Arm Spool

 

Description/Location 0.3 0.5 1.0
In cleanroom before moving spool 13 6 0
During moving the spool 69 31 6
At spool flange gap - air from inside tube 35 20 12
At GV5 flange gap - air from inside tube 11 9 5
While closing the sock 64 40 12
In cleanroom after install complete 170 107 40