LVEA: Viewport and deionizer Gate Valve survey and work on LVEA in preparation to pump down. Gerardo found three Viewports with scratches that will need to be replaced. Kyle is doing a general readiness vacuum survey in LVEA. There will be a chamber close out checklist review in the control room today at 13:00. The Ameristat/C3 covers will need to be removed from around the HEIP piers at the BSC and HAM chambers. HAM6: The north door will be removed for alignment and ISI work. The ISC table to be reinstalled on the north side. OpLevs: Jason working on the X-Arm Viewports. EE: Cabling work at HAM6. End-Y: Work on Rai’s deionizer experiment equipment installation. End-X: Apollo to torque bolts on BSC9 door. Chamber close out review. Need to install gate valve for deionizer.