Reports until 10:11, Monday 04 August 2014
H1 General
jeffrey.bartlett@LIGO.ORG - posted 10:11, Monday 04 August 2014 (13181)
8:15 Meeting Minutes
LVEA:
	Viewport and deionizer Gate Valve survey and work on LVEA in preparation to pump down.
		Gerardo found three Viewports with scratches that will need to be replaced. 
	Kyle is doing a general readiness vacuum survey in LVEA.
	There will be a chamber close out checklist review in the control room today at 13:00.
	The Ameristat/C3 covers will need to be removed from around the HEIP piers at the BSC and HAM chambers. 

HAM6: 
	The north door will be removed for alignment and ISI work.
	The ISC table to be reinstalled on the north side.   
  
OpLevs:
	Jason working on the X-Arm Viewports. 
EE:
	Cabling work at HAM6. 
End-Y:
	Work on Rai’s deionizer experiment equipment installation. 
End-X:
	Apollo to torque bolts on BSC9 door. 
	Chamber close out review.
	Need to install gate valve for deionizer.