LVEA laser safe 09:00 – FSS out of lock. Lowered the FSS resonance threshold to 0.3 from 0.4. Peter King will look into PSL alignment. 09:15 Nathan – Working in the optics lab 09:58 Greg – At BSC1 area working on laser barriers for CO2 laser alignment 10:01 Travis – Working on mobility experiment at HAM3 10:06 Betsy – General post chamber close cleanup in the LVEA 10:13 Gerardo – Working on viewport survey at BSC1/BSC2 area 10:55 Jim – Recycle mid-X weather station software 11:12 Peter – Going into H1-PSL enclosure to tweak ISS alignment/power loss 12:00 Power cycle restart of the camera monitor computer in the control room. 12:42 Kiwamu & Dave – Kiwamu update and restart LSC model. Dave restart DAQ 13:00 Bubba – End-Y working on deionizer installation 13:27 Bubba – Drilling bolt holes in floor at End-Y 13:47 Gerardo – Viewport survey in LVEA 13:52 Allister – At TCS-X to examine optics 14:10 Karen – Reported the emergency lights are on in the End-Y VEA 14:37 Doug & Jason – Working at the ITM-X manifold 14:52 Jeff & crew – At End-X 14:55 Alarm on corner station chiller pump #3. Pump tripped off. Informed John W. 15:25 Summer students – PEM work at End-X