Installation meeting notes
BSC1 and 3 gatevalve work in progress
The extra viewport on BSC2 will be left in place

IOT2 table to be moved to west side of HAM2

The north door will be pulled on HAM6 for ISI rebalancing
wipe down and particle assessment beforehand

Pumping vertex by noon

HAM6: placing of fast shutter component today, remainder of work requires beam

Peter K. is checking alignment on PSL table

TCS:
Started bonding polarizer
Start work on X arm table after lunch, request for laser hazard in the afternoon

ITMX optical lever work in the morning

EE work in racks by HAM6

Hugh will be removing the ameristat at HAM4

Rai W. here to work on mirror charging experiment at end Y
end Y will be transitioned to laser safe

tiltmeter experiment underway at end X

Kiwamu updating and restarting the ASC realtime model

Praxair delivery to mid Y

upgrade of conlog