Displaying report 1-1 of 1.
Reports until 19:55, Tuesday 05 August 2014
LHO General
patrick.thomas@LIGO.ORG - posted 19:55, Tuesday 05 August 2014 (13208)
Ops Summary
Apollo installing viewport gatevalves on H1 BSC chambers in LVEA for ionizer equipment

09:03 Nathan starting unattended laser work in the optics lab
09:12 Hugh to HAM4 to remove ameristat and unlock HEPI
09:18 end Y transitioned to laser safe
09:32 Jeff B. and Andres to HAM6, contamination control check
09:41 Travis checking on mobility experiment on west door of HAM3
09:46 Jim B. to check on SEI IOP (unexpected shutdown at 8:41)
09:47 Betsy picking up equipment in LVEA
10:13 Dave and Jim B. restarting end Y SEI, will take down end Y ISC and SUS (on same Dolphin network)
10:16 Hugh done unlocking HEPI
10:39 Dave and Jim B. restarted the mid X weather station
10:56 Sheila to IOT2L, if it has been moved into place will install light pipes
11:00 Bubba to end X to retrieve part for door removal
11:00 Jordan, Paul and Sudarsham to Y1 beam tube enclosure, accelerometer measurements
11:08 Jason and Doug to begin alignment of ITMX optical lever, Arnaud to put ITMX mirror into nominal position
11:18 SnoValley to see John W.
11:34 Paradise water delivery
11:34 starting HAM6 door removal
11:43 Peter K. to end Y to take pictures through viewport
12:03 Krishna, Eric and Jeff K. to end X to work on BRS
13:08 Christina to end X and end Y to install magnetometers
13:12 Aaron to start drilling in the old H1 PSL chiller room (WP 4777)
13:39 Paul and Jordan to end X for PEM measurements
13:57 Dan and Koji to HAM6 to install fast shutter
14:17 Gerardo, Rai and Kyle working on ionizer experiment at end Y
15:43 Fire department investigating trouble panel alarm at mid Y
16:45 Nathan supervised by Dick G. in optics lab

Maintenance tasks:
PSL chiller filled yesterday, left alone
reset HEPI overflow counters for HAM3, BS.
John W. confirmed work was done regarding this alog. I set HVE-MY:Y5_246BTORR.HIHI back to 5e-08.
Displaying report 1-1 of 1.