Reports until 17:58, Tuesday 05 August 2014
H1 ISC
koji.arai@LIGO.ORG - posted 17:58, Tuesday 05 August 2014 (13224)
HAM6 Fast shutter installation

[Dan Koji]

A first fast shutter was placed at the approximate location on the HAM6 table. The cable has been connected to the shutter.
The feedthru end of the cable is waiting for replacement of a 2.75" feedthru flange. This flange is D3-3 according to D1002877.

The table space is really tight. The space for the shutter was just barely OK to place it behind OM3. It yet needs precise aligment.
The path for the (expected) reflected beam from the shutter was cleared by moving the beam dump for ASAIR beam diverter

The golden beam dump was installed at the edge of the table. This was realized by moving the cable post for the beam diverter.

Images attached to this report