Air controller was installed and is wired and working. There are two units, one outside the anteroom and one inside that can control the HEPA units. Double doors for the anteroom arrived today and were installed. The chiller support structure was installed in the chiller room and we are waiting on a few more parts before we can hang the chiller.
Dust counts are good.