Displaying report 1-1 of 1.
Reports until 16:06, Friday 15 August 2014
LHO General
edmond.merilh@LIGO.ORG - posted 16:06, Friday 15 August 2014 (13420)
Daily Ops Log
LVEA is LASER SAFE
08:00 Alarms going off for CP1 and CP2. CP1 dewar at 58% and press. at 76.8%. CP2 dewar at 26.3% and press. at 81.9%
8:15 vaccuum status looks good w/corner currently VENTED- viewport rotation going on at HAM6
08:25 DAQ status looks to be OK
08:29 FE status looks ok. Timing Watchdog SUSAUXEX??
08:31 Aaron to End stations to turn on Beckhoff computers
08:44 Krishna to End-X. WIll be connecting tiltmeter to the DAQ later this afternoon
09:01 Corey out to HAM6 to bring  John a camera
09:12 J. Warner out to lock BSC2 HEPI to allow Kyle to perform his tasks
09:23 Fil and co. running cables from electronics room to HAM4 for analog cameras
09:42 Nathan into the optics lab 
10:42 Just got report that in-chamber work at HAM6 is complete. Pump down should start soon.
11:29 Fil to End-Y to turn on ESD
11:41 spotted Kyle working at BSC2- pressure sensors
12:00 Filiberto finished turning on ESD at both end stations.End-Y had to be revisited to reset the DAC -Richard suggests that turning the bias off before powering on     may alleviate throwing the DAC channels into la-la land.
12:15 Kyle finished at BSC2
12:32 Tim McDonald to LVEA to look for cables.
12:39 Tim to End-X to do B&K Hammering
12:46 Dave Barker will be changing the IOP model for the mod stations to include PEM monitoring - this will be done remotely. THen he and Jim Batch will be travelling to End-X to investigate the SUSAUXEX Timing issue. Also going to MY to fix weather station
13:02 Karen headed to End-Y
13:08 Cris headed to End-X
13:25 J Warner to unlock BSC2 HEPI
13:28 Jeff Kissel to End-X
13:43 Jim and Dave return
13:49 HAM5/6 HEPI,ISI,SEI Guardian is "white"
14:10 PEMMX is down - suspect it's being worked on - noticed back up @ 14:44
14:48 Cris back from End-X
14:45 Nathan is out of the optics lab



Displaying report 1-1 of 1.