[Jim Arnaud]
This morning the quad iop and sus models of the staging building were restarted in preparation of future testing of QUAD09. The system would restart with wrong filters engaged (the 'norm' filters of the damping were on, whereas the input is not calibrated in um), so a new burt was saved with the good config.
Attached are some notes for testing QUAD09 in the staging building, as well as how to start the models