Reports until 16:00, Tuesday 19 August 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Tuesday 19 August 2014 (13494)
OPs Shift Summary
8:15-8:30 Morning Meeting
8:33-Heading to End Y for B-K hammering work - T. MacDonald
8:35-Crystal chiller has been refilled (added 250 ml of water to bring the level up to maximum) – Operator
9:22-Checking mobility camera in HAM3 - Travis
9:24–Heading to work in the optics lab - Nathan 
9:55-LN2 delivery – Praxiar
10:09-Reset HEPI overflow counters for HAM3, HAM4, ITMX, and BS – Operator
11:16-Water delivery - Paradise 
11:35- Heading into the LVEA (HAM2 area) – Kiwamu/Keita
11:52-Working at End X – Krishna
12:55-Heading to End Y for cleaning – Karen
13:17-Back from the LVEA – Kiwamu/Keita
14:23-Returned from End Y – Karen
14:40-Working in the LVEA (craning) – Kyle
15:01-Finished working in the LVEA – Kyle
15:14-Moving Leak Detector Setup from the LVEA to End X – Gerardo/Filiberto

Note: Analog video cameras were not working today (see Alog# 13487)