Borja, Sheila, Gerardo
As per original plan, and after taking another set of charge measurements in X and Y, today at about UTC 2014-08-20 23:00:00 we turned on the green laser light with a measured power of 57.5mW going into the periscope that injects the beam into the ETMX chamber. In parallel Gerardo turned on the turbo pumps in ETMY and closed the gate valve of the ion pump.