Reports until 16:07, Thursday 21 August 2014
LHO General
edmond.merilh@LIGO.ORG - posted 16:07, Thursday 21 August 2014 (13531)
Daily Ops Log

08:15 LVEA is LASER SAFE 

08:30 Automated message about 200 West Area Emergency Drill - e-mail sent out LHO-All

08:44 Vacuum status is normal IFO wide. Corner station is pumping down and currently at 10 -6 torr.

09:04 Travis -out to LVEA to look for cable clamps for Jim

09:17 Gerardo -down to End-X to test power supply for ION pump

09:18 200 West Area Drill is terminated

09:20 Praxxair in for N2 delivery

09:30 Visitor arrived on-site for tour

09:40 Cyrus-to End-X to check out FMCS "thing" ?

09:54 Dale -will be bringing in a tour group around 11:00

09:56 Koji - into LVEA for capton washer installation in HAM6

10:13 Cyrus - back from End-X

10:18 Jason -OpLev work @ HAM3. Also cable swap on SR3

10:30 Gerardo -back from End-X

10:37 Cyrus -Back out to End-X to swap parts

10:38 Praxxair out

11:02 Cyrus - returns! (cue music and credits)

11:15 Tour group in control room

13:27 Gerardo -to End-X to test ION pump power supplies

13:45 Cris - cleaning at X-End

14:40 Cris - back from End -X

15:30 LVEA IS LASER HAZARD