Reports until 16:59, Wednesday 07 September 2011
X1 SUS
jeffrey.garcia@LIGO.ORG - posted 16:59, Wednesday 07 September 2011 (1358)
ITMy LS Separation Preps
Bland, Sadecki, Buckland, Torrie

Reverified that the dummy Test Mass is at 22.5mm from the bottom of the cylinder to the top of the LS frame (within the 21.7mm +/-1mm tolerance).

Today we removed the Sleeve and Vibration Absorbers from the ITMy, locked it down, unlaced the PUM and UIM Extension cables, pushed the Top Mass down to facilitate wire segment removal, removed some Top OSEMs to facilitate pushing the Top Mass down, and unclamped the Lower and Upper wire clamps at the Top Mass blade tips.  We then test fit the LSAT hanger plates and are now looking for more hardware.  We will drop the LS tomorrow.

We stacked up the LSAT Elevator onto the 5-axis lift table, on the Lift cart.  We hooked up the elevator and verified that it elevated with the controls.  After playing with the full unit a bit, Calum and Kurt decided that they still were not happy with the rolling casters on the lift cart so they re-stacked the 5-axis table and elevator onto the new scissor lift.