08:30 Fire department on site to perform pump maintenance 08:36 Peter K. to H2 PSL enclosure 08:41 Hugh to end X, end Y to look at HEPI pump stations 08:51 Aaron pulling cables for cameras and optical levers in LVEA 08:59 Fire department returning 09:57 Jason starting work on SR3 optical lever 10:53 Sudarshan to end X to calibrate tiltmeter 10:54 Hugh done at end X and end Y 10:58 Car arrives to access roads for shrub steppe project 11:25 Peter K. out of H2 PSL enclosure 11:33 Jason done 12:37 Filiberto starting camera work (WP 4819) 12:42 Karen to end Y 13:21 Ed to LVEA to help Aaron pull cables 14:04 Karen done at end Y 15:54 Sudarshan back