08:30 Peter- to H2 enclosure
09:01 Jason- to LVEA to have a look at the BSC2 Oplev LASER
09:10 Hugh- to End-X to change Parker valve
09:12 Richard- to HAM6 to check out installation
09:30 HEPI pump shutdown for valve replacement
09:40 Rich Mc- out of LVEA
10:15 End-X HEPI pup back up and runnin after Parker valve change-out
10:20 Dave- started cold cathode on HAM6
10:25 Travis- out to W Bay to work on Quad 3 IFO
10:53 Rich- out to HAM6 to have a look at Cold Cathode b. Not reading back
11:08 Rich- out of LVEA. Cold cathode reading good ~6.5e-06
11:15 Hugh- back from End-X
11:25 Cris- to End-X. not in VEA
11:35 Jason- out of Lvea. replaced BSC2 oplev laser
11:40 Nick- will be working on OMC. Will need to misalign ITMX
13:12 Nick- LVEA to ISCT6
13:30 reset SUS ETMX and TMSX Watchdogs
13:42 Nick out of LVEA
14:06 List of currently tripped WDs: HEPI HAM1, HAM6, IOPSEIH16; IOPSEIEY,SIETMY; IOPPEMMX; IOPSEIEX, SIETMX
14:20 Aaron - terminating 12V cables in Bier Garden
14:46 Hugh- introduced me to the new HEPI addition to the ALH
15:46 signed two work permits: #4821 & #4822