david.barker@LIGO.ORG - posted 16:32, Friday 29 August 2014 - last comment - 00:07, Saturday 30 August 2014(13682)
new h1omc model installed, DAQ restarted

Nicolas, Keita, Dave

The h1omc model was modied. In the ASC block, 8 filtermodules were removed and 4 were added downstream. In the DAQ list, 8 OUT channels were removed and 4 OUT were added (all at 2048Hz). Four CLOCK channels were connected to the CLK outputs of the oscillators (previously they were tee'ed to the SIN outputs).

After the model was restarted, we restarted the DAQ to sync with the new INI file. The safe.snap restore was not good, so I manually burt restored to 16:10 (h1omc safe.snap needs updating).

Comments related to this report
nicolas.smith@LIGO.ORG - 00:07, Saturday 30 August 2014 (13684)

Attached is an illustrated summary of the filter bank changes.